10/25 2:30PM

Water Restoration Update: 
Water has been restored to nearly all customers at this time. Due to the age of the main, it utilized non-standard couplings extending the time to complete the repair. Please flush your cold taps until your water is clear. Contact 802-863-4501 for any urgent water questions.

Detour Update:
Once the water main repair is complete, street restoration will begin. At this time, Pine St between Birchcliff and Lakeside is expected to remain closed into the evening hours. 

- Before 8PM: Vehicles on Tuesday should continue to avoid Pine Street if possible and should detour at Locust Street or Flynn Avenue on to Shelburne Road. 

- Local Detour Before 8PM: Via Lakeside Avenue through the large surface parking adjacent to the Champlain Parkway construction site and onto Sears Lane. 

- After 8PM: The Shelburne St Roundabout is scheduled for closure during the overnight hours so all motorists should plan on using the current "local traffic" detour for Pine St: via Lakeside Avenue through the large surface parking adjacent to the Champlain Parkway construction site and onto Sears Lane.  Please use caution and drive slowly on the Lakeside Ave/Sears Ln detour. Please follow all on street detour signage.

Gas Update: Follow details at vermontgas.com or by calling 802-863-4511. 

Contact: Rob Goulding, DPW Public Information Manager, RGoulding@burlingtonvt.gov

###